Why direct

The same karigar. Without the showroom margin.

We are a goldsmith family. Our peers have spent their working lives on these benches. When you buy from a retail counter, you buy the same craft with rent, stock financing and brand margin stacked on top.

Straight from the karigar bench

We are a goldsmith family. Your piece is made on our own benches in Jaipur — no showroom chain, no franchise margin, no middle desk.

Save ₹1–2 lakh on a bridal set

A retail counter loads 22–30% over workshop cost. On a ₹6–8 lakh bridal set that difference alone is one to two lakh rupees back in your pocket.

Certified, always

Every piece leaves with hallmarking on the metal and a lab report on the stones. Weight, purity and stone grade are printed on your invoice.

Full transparency on weight

Gross weight, net weight, stone weight and making charge are shown before you commit. Nothing is hidden inside a single 'per-piece' price.

15–30 day make-to-order

Jadau is set by hand. Simple pieces take about 15 days, full bridal sets up to 30 — which is why brides 1–2 months out should start now.

You choose every component

Karat (14K to 20K), silver alloy (74% or 92.5%), and stones — natural, lab grown or imitation. We re-quote in hours, not weeks.

A worked example

Bridal set, 18K gold, natural polki — workshop price₹6,20,000
Same set at a retail counter (approx +26%)₹7,81,000
What you keep by coming direct≈ ₹1,61,000

Illustrative. Your actual figure depends on the day's metal rate, weight and stone grade.

How a piece is made

01

Share the reference

Send a photo, a screenshot or a sketch on WhatsApp or through the customiser.

02

Get a transparent estimate

Live metal rate × expected weight + stones + making. You see the breakup.

03

Approve the CAD / wax

We share drawings and progress photos before the metal is cut.

04

Handset in the workshop

Jadau kundan setting, meena work and polish, 15–30 days depending on the piece.

05

Certify and deliver

Hallmark, lab report, final weight slip, insured dispatch to your door.

Questions brides ask us

How far ahead of the wedding should I order?

Start 45–60 days before the first function. Make-to-order Jadau takes 15–30 days on the bench, plus certification and dispatch. If your wedding is inside 30 days, message us — we keep a small ready-to-wear shelf.

Why is buying direct from the manufacturer cheaper?

A retail jeweller buys the same piece from a workshop like ours and adds showroom rent, staff, inventory financing and brand margin. That is typically 22–30% on top. Coming direct removes that layer entirely — the karigar, the metal and the stones stay the same.

Is the price fixed at the time of order?

The metal rate is locked on the day you confirm and pay the advance. Because everything is handmade, the finished weight can move slightly against the estimate — the per-gram rate never changes, only the actual grams.

What gold and silver options can I pick?

Gold in 14K, 18K or 20K. Silver in 74% traditional alloy or 92.5% sterling (9125). Stones can be natural uncut polki, lab grown, or imitation — you can mix grades across a set to hold a budget.

Do you certify the jewellery?

Yes. BIS hallmarking on gold, 925 stamping on sterling silver, and an independent lab report for diamonds and polki. Certification numbers are recorded against your order.

Can I use my SIP savings against a piece?

Yes. Every rupee you invest sits as credit in your account. Complete 12 months and we add a 13th month from our side — the average of your 12 instalments — which you can redeem against any order.

Talk to the workshop

We only use these details to quote your piece. No marketing lists.